Control calendar
Cadence comes from policy — it is what an auditor measures. How often a collector samples is a separate thing, shown on the Collectors page.
| Control | Status | Cadence | Last | Next due | TSC | Description |
|---|---|---|---|---|---|---|
| IT-05:CM-01 | Event-driven | Per change | — | — | CC8.1 | Production changes documented in Jira with risk, test evidence, rollback … |
| IT-05:CM-02 | Event-driven | Per change | — | — | CC8.1 | Normal changes require independent reviewer approval before deployment |
| IT-05:CM-03 | Event-driven | Per change | — | — | CC8.1 | Changes tested or validated prior to deployment; evidence documented |
| IT-05:CM-04 | Event-driven | Continuous | — | — | CC8.1 | Only authorized personnel may implement production changes |
| IT-05:CM-05 | Event-driven | Event-driven | — | — | CC8.2 | Emergency changes documented immediately, approved post-implementation |
| IT-05:CM-06 | Event-driven | Continuous | — | — | CC8.1 | Change activity logged capturing who, when, and what was changed |
| IT-05:CM-08 | Event-driven | Event-driven | — | — | CC8.2 | Post-implementation review for emergency changes manual |
7 controls shown.