Control calendar
Cadence comes from policy — it is what an auditor measures. How often a collector samples is a separate thing, shown on the Collectors page.
| Control | Status | Cadence | Last | Next due | TSC | Description |
|---|---|---|---|---|---|---|
| IS-11:VM-04 | Event-driven | Per scan | — | — | CC7.2 | CVSS-based risk scoring and P0–P5 prioritisation applied to all findings |
| IS-11:VM-05 | Event-driven | Event-driven | — | — | CC7.2 | P0: patch within 24h if available; workaround within 48h if not |
| IS-11:VM-08 | Event-driven | Continuous | — | — | CC7.1 | Vendors disclose vulnerabilities within 24h (the software composition ana… |
3 controls shown.